Performing electrical work and equipping the project
Construction of the Ston bypass
The project “Construction of the Ston Bypass (DC414), Sparagovići/Zaradeže – Prapratno and Prapratno – Doli” involved extensive electrical installation work and the implementation of advanced systems. Dynamic traffic signals were installed, including SPZ, LED markers, information displays, SVT, ZUR, traffic lights and ramps, ensuring a PIS traffic management system. Meteorological stations and a video surveillance system were installed to monitor conditions and safety on the route. Fire alarm and fire protection systems were implemented in the Polakovica and Supava tunnels, and the entire project also included the installation of a remote control and monitoring system (RCMS). Finally, all equipment was integrated into the COKP Zaradeže into a unified PIS and RCMS system, ensuring centralized management and supervision of the traffic infrastructure.

2021. – 2024.
Performing electrical work and equipping the project
Hrvatske ceste d.o.o.
PRODUCTS USED IN PROJECT
NEXT PROJECT